CDSCO Manufacturing Licence for Medical Devices: MD-3, MD-7 and What Happens Before Grant

medfins og image

Most Indian manufacturers learn how the manufacturing licence works the hard way: the application goes in, and then the factory is audited against a file that was written for someone else. Under the Medical Devices Rules, 2017, the form you file, the authority that decides it, and whether your site is audited before or after the licence all depend on one thing β€” the risk class of the device.

This guide covers the route for each class, the file, the timelines and the conditions after grant. For how we run the whole application, see our CDSCO manufacturing licence service.

Start with the class, because it decides everything else

Rule 8 splits the work. Manufacture of Class A and Class B devices is licensed by the State Licensing Authority β€” the State Drugs Controller where the factory sits. Manufacture of Class C and Class D devices is licensed by the Central Licensing Authority, the Drugs Controller General of India. Applications are filed online, through CDSCO’s Medical Devices Online portal or the National Single Window System (FAQ Q8).

  • Class A, non-sterile and non-measuring: no manufacturing licence. These devices are registered on the Medical Devices Online portal, which issues a system-generated registration number with no fee (FAQ Q2, Q69–Q71). Labelling rules still apply. See our Class A registration guide.
  • Class A (sterile or measuring) and Class B: apply in Form MD-3 to the State Licensing Authority; the licence is granted in Form MD-5.
  • Class C and Class D: apply in Form MD-7 to the Central Licensing Authority; the licence is granted in Form MD-9.
  • Loan licence β€” where you make the device at another licensee’s site that already makes the same device: Form MD-4 leading to MD-6 for Class A and B, and Form MD-8 leading to MD-10 for Class C and D.

Classify from the Indian rules and CDSCO’s published classification list, not from your CE or FDA class. Only the Central Licensing Authority can classify a device; if yours is not on the list, you ask CDSCO to classify it (FAQ Q77, Q78). If the device has no predicate in India, or is a new IVD, you need permission in Form MD-27 or MD-29 before any manufacturing licence can be granted (Rule 25(4)). Unsure of the route? See our overview of which CDSCO licence you need.

Class A: licence first, audit afterwards

For a Class A device that is sterile or has a measuring function, Rule 20(4) requires the State Licensing Authority to scrutinise the documents and grant or reject the application within 45 days. No audit is needed before grant. But a registered notified body must audit the site within 120 days of the date the licence was granted.

That second step is the one manufacturers forget. The licence arrives quickly, production starts, and the audit lands four months later against a quality system that was only ever written down.

Class B: the notified body audit comes first

For Class B, the site must be shown to conform to the Fifth Schedule quality management system before the licence is granted (Rule 20(5)). The sequence in Rule 20(6) is:

  1. a notified body registered with CDSCO audits the site within 90 days of the date of application;
  2. the notified body sends its report to the State Licensing Authority within 30 days of completing the audit;
  3. the State Licensing Authority grants the licence in Form MD-5, or rejects the application, within 20 days of receiving the report.

You do not choose the notified body. The State Licensing Authority assigns one from those registered with CDSCO after reviewing the online application (FAQ Q83). Our guide to Fourth and Fifth Schedule audits covers what the auditor checks on the day.

Class C and D: scrutiny, then a government inspection

Form MD-7 applications are processed at CDSCO’s zonal offices and headquarters. The steps in Rules 21 to 25 are:

  1. Scrutiny. The Central Licensing Authority completes scrutiny within 45 days of online submission, and may bring in subject experts (Rule 21(3)–(4)). If deficiencies are pointed out, the 45 days run from the date you remove them (Rule 21(7)).
  2. Inspection. If the documents are complete, the site is inspected within 60 days of the date of application by a team of at least two Medical Device Officers, with or without an expert, or by a notified body registered for Class C and D (Rule 23(1)).
  3. Report. The team reports to the Central Licensing Authority through the portal, with a copy to you (Rule 24).
  4. Decision. The licence in Form MD-9 is granted, or the application rejected, within 45 days of receiving the inspection report (Rule 25(1)).

A loan licence needs no fresh inspection if the site is already licensed to make that device (proviso to Rule 23(1)). An appeal against rejection goes to the Central Government within 45 days (Rule 25(2)).

What goes in the file

The documents come from Part II of the Fourth Schedule. For a Class A device the list is short: device description, intended use and specification; materials of construction; working principle; labels and instructions for use; a summary of any serious adverse events and the action taken; a plant master file; constitution details; an essential principles checklist; and a signed undertaking that the site complies with the Fifth Schedule.

For Class B, C and D the list adds a full device master file to Appendix II (Appendix III for IVDs), any test licence used to generate quality control data, and β€” for IVDs β€” a performance evaluation report from the central testing laboratory or a laboratory registered with CDSCO.

CDSCO’s checklist for a fresh Form MD-7 application has eleven sections:

  • Sections 1–5: covering letter, Form MD-7, fee challan, constitution of the firm, and the site ownership or tenancy agreement.
  • Section 6 β€” plant master file to Appendix I: general information, organisation chart, qualifications of personnel, premises, a scaled layout, the list of manufacturing and testing equipment, sanitation, production, quality assurance, storage and documentation.
  • Section 7 β€” quality management system: the Fifth Schedule undertaking, quality manual, control of documents and records, management responsibility, resource management, production control, internal audit, nonconforming product, CAPA, and a table of areas showing the environmental requirements in Annexure A of the Fifth Schedule.
  • Section 8 β€” device master file in twenty parts, from the executive summary and grouping justification to risk analysis, verification and validation, sterilisation and software validation where they apply, real-time and accelerated stability data, post-marketing surveillance data, and batch release certificates for at least three consecutive batches.
  • Sections 9–11: other documents, any test licence in Form MD-13, and Form MD-27 permission where there is no predicate device.

Three FAQ answers shape the device master file. Only accessories and components defined in the file as part of the main device, and shown in its instructions for use, should be listed (Q64). Accelerated stability data can support a provisional shelf life only if the real-time study is already running and its results follow (Q34, Q37). And a device made only for export is marked “For Export only” under its generic name in the application (Q87).

The people the licence depends on

Rule 22 makes the licence conditional on competent technical staff. Manufacturing must run under someone with a degree in engineering in a relevant branch, pharmacy or an appropriate science and at least two years’ experience in manufacturing or testing medical devices β€” or a diploma in engineering or pharmacy and at least four years. Testing must run under someone with a relevant degree or diploma and at least two years in testing medical devices. Rule 26(xi) allows manufacture and testing only under their supervision, so losing that person without cover is a compliance problem.

Fees

Fees are set in the Second Schedule, per manufacturing site and per distinct device, and they rise with risk class. What matters more than the amounts: a separate fee is payable for each brand (FAQ Q15); fees are not refunded if you withdraw (Q14); and for Class A and B, the fee is paid to the State Licensing Authority in the way that State specifies (Q53). Settle brands and grouping before the challan is paid.

After the licence: the conditions that catch people

  • Batch release. Line up your test route before production: every batch must be tested against specification before release, in your own laboratory or one registered under Rule 83 (Rule 26(v)).
  • Reference samples. For invasive devices and IVDs, keep at least one unit from each batch until 180 days after that batch expires (Rule 26(viii)).
  • Vigilance. Report any suspected unexpected serious adverse event, and the action taken including recalls, within 15 days of it coming to your notice (Rule 26(ii)).
  • Changes. Major changes listed in the Sixth Schedule need prior approval; the authority is to decide within 45 days, after which the change is deemed approved. Minor changes are notified within 30 days of taking place (Rule 26(iii)–(iv)).
  • Records. Keep an audit or inspection book in Form MD-11 for the notified body or Medical Device Officer to record observations (Rule 26(vii)).
  • Stoppages. Tell the authority if manufacturing stops, or the site closes, for 30 days or more (Rule 26(xii)).
  • Unannounced inspections. For Class A and B, the State Licensing Authority inspects licensed sites at random, at no fewer than two per cent of the notified body audits in that State for that class (Rule 28).
  • Change in constitution. Inform the authority within 45 days and apply for a fresh licence within 180 days; the existing licence stays valid until that application is decided (Rule 27).
  • New products. Additional devices at a licensed site need permission through an endorsement application with fee and documents (Rule 25(3), FAQ Q17).
  • Retention. MD-5 and MD-9 licences are valid in perpetuity, provided the retention fee is paid before each five-year period ends. Late payment is allowed for 180 days at two per cent a month; after that the licence is deemed cancelled (Rule 29).

Where this goes wrong

Applying for the wrong class. Using the EU or US class instead of CDSCO’s list sends the file to the wrong authority. Check the published list, and ask CDSCO to classify if the device is not on it.

Treating the Class A audit as optional. The licence comes without an audit, but the notified body audit within 120 days does not. Have the quality system running, not just documented, from day one.

A quality manual that does not match the floor. Class B auditors and Class C and D inspectors test the Fifth Schedule against what they see. The environmental table in section 7.11, the equipment list in the plant master file and the actual rooms must agree.

Competent technical staff on paper only. Qualifications and experience must meet Rule 22, and the person must actually direct manufacture and testing. Plan for cover if they leave.

Retention and constitution changes left to chance. A missed five-year retention has a 180-day window before cancellation, and for a company a transfer of more than 50 per cent of voting shares counts as a change in constitution (Rule 3(j)). Put both in the compliance calendar.

Frequently asked questions

Who grants a medical device manufacturing licence in India?

The State Licensing Authority for Class A and Class B devices, and the Central Licensing Authority (the Drugs Controller General of India) for Class C and Class D devices. Class A non-sterile, non-measuring devices need registration on the portal, not a licence.

What is the difference between Form MD-3 and Form MD-7?

MD-3 is the application for a Class A or B manufacturing licence, filed with the State, and leads to a licence in Form MD-5. MD-7 is the application for Class C or D, filed with CDSCO, and leads to a licence in Form MD-9.

Is the manufacturing site audited before the licence is granted?

For Class B, C and D, yes β€” a notified body audit for Class B, and an inspection by Medical Device Officers or a registered notified body for Class C and D. For Class A, the notified body audit follows within 120 days of grant.

How long does a CDSCO manufacturing licence take?

The Rules set each step: 45 days for a Class A decision; for Class B, an audit within 90 days of application, a report within 30 days and a decision within 20 days; for Class C and D, inspection within 60 days of application and a decision within 45 days of the inspection report. A complete, consistent file is the part within your control.

Can I choose the notified body that audits my Class B site?

No. The State Licensing Authority assigns a notified body registered with CDSCO after reviewing the application.

Does a manufacturing licence expire?

No. It remains valid in perpetuity unless suspended or cancelled, provided the licence retention fee is paid before each five-year period is completed.

Talk to us about your manufacturing licence

Medfins has delivered 175+ regulatory projects covering 250+ products for 100+ clients. We prepare plant and device master files, set up ISO 13485 and Fifth Schedule quality systems, and get sites ready for the notified body audit or CDSCO inspection. See our CDSCO manufacturing licence service or contact our team.

Official sources: CDSCO checklist for Form MD-7 Β· CDSCO FAQ on Medical Devices

Free downloadCDSCO Registration Checklist 2026Licence route, Device and Plant Master File items and import documents in one checklist.
Get the free checklist
Medfins International regulatory team, led by Arunkumar Chokkalingam, Managing Director and CQI & IRCA certified ISO 13485 Lead Auditor. Last updated: . Questions about your device? Talk to our team.

Similar Posts